Loading...

Specifications

it_work

Coverage Area

The surface must be clean, dry and free from dust and poorly adhering materials, grease and moss growth. Extra attention should be given for heavy oxidized areas.

Method of Application

who_img

1st coat

02 parts of paint: 01 part
of water

who_img

2nd coat

02 parts of paint: 01 part
of water

who_img

3rd coat

02 parts of paint: 01 part
of water

Allow 4–6 hours between coats and apply in the cross direction to previous coat.

Application shall not be carried out during rain. Recommend to allow a minimum curing time of 72 hours after application.
(Note: Paint surface shall not be exposed to rain during the curing stage.)

who1
who4
whohelp

NEED HELP NOW?

+94 777 80 60 30

who4
who1
it_work

Coverage

40 – 50ft2 per litre (for 02 coat application on ‘semi-rough’ finished surfaces)
*Note: The coverage capacity may vary depending on the conditions of the surface.